Christian Huemer
Ao.Univ.Prof. Mag.rer.soc.oec.
Dr.rer.soc.oec.
Christian Huemer
- Email: christian.huemer@tuwien.ac.at
- Phone: +43-1-58801-18882
- Office: (1040 Wien, Favoritenstrasse 11)
- About: main scope: inter-organizational systems, conceptual modeling, ERP systems electronic data exchange, electronic billing
- Orcid:
- Keywords: Model Engineering, Electronic Data Interchange, E-Business, Service Sciences, Business Process Modeling
- Roles: Associate Professor
Publications
A graphical toolkit for ISA-95 : empowering end users to develop bridges between ERP and MES
Laurens LangBernhard WallyChristian HuemerKeywords: Modelling, Domain Specific Language, Manufacturing, Industry 4.0
Astract: The dawn of the fourth industrial revolution, Industry 4.0 has created great enthusiasm among companies and researchers by giving them an opportunity to pave the path towards the vision of a connected smart factory ecosystem. In order to achieve this extensive digitization of industrial production, among the main research issues are the horizontal and vertical integration, which can be realized with the help of industrial standards. In order to handle the interconnected nature of the huge variety of industry standards, a model-driven approach to transform these standards is meaningful. Among the plethora of industrial standards available in the context of smart manufacturing, one series of standards is consistently being mentioned for dealing with manufacturing operations management: IEC 62264. Its second part provides a conceptual model for the description of production systems and their capabilities, including runtime information such as tangible maintenance schedules or achieved production goals. In this work, we present a concrete graphical syntax and toolkit for the creation and presentation of IEC 62264-2 compliant models, using techniques from model-driven (software) engineering. We have evaluated our tool by conducting a user study for assessing its usability and effectiveness. As a consequence, the engineered graphical toolkit empowers end users with no coding skills to model automated production systems.
Lang, L. (2020). A graphical toolkit for ISA-95 : empowering end users to develop bridges between ERP and MES [Diploma Thesis, Technische Universität Wien]. reposiTUm. https://doi.org/10.34726/hss.2020.62429
TransIT: Interdisziplinäres Forschungsprojekt zur digitalen Transformation im Tief- und Tunnelbau
Alexandra Mazak-HuemerRobert GallerRobert WenighoferGerald GogerThomas BednarChristian HuemerM. Wimmer
Mazak-Huemer, A., Galler, R., Wenighofer, R., Goger, G., Bednar, T., Huemer, C., & Wimmer, M. (2020). TransIT: Interdisziplinäres Forschungsprojekt zur digitalen Transformation im Tief- und Tunnelbau. Bauaktuell, 4, 168–169. http://hdl.handle.net/20.500.12708/140548
Keywords: Model-Driven Engineering, Smart Manufacturing Systems, ISA-95, AutomationML, Resource-Event-Agent, OPC Unified Architecture, IEC 62264, IEC 62714, IEC 62424, IEC 62541, PDDL, Enterprise Resource Planning, Manufacturing Operations Management, Production Planning
Astract: Automated production systems are following a general technological trend: increasingly complex products, combined with drastically reduced lot-sizes per product variant, as well as shorter response and production times are being demanded. In order to be able to meet these expectations, modern IT systems at all levels of the automation hierarchy are required: from business related software at the corporate management level, down to the programmable logic controllers at the field level. For a well-designed coupling of systems that are located at different levels, it is necessary to find, define, and implement clear data conversion mechanisms - this endeavor is also known as vertical integration. At the same time, it is necessary to automate the inter-organizational data exchange - an aspect of horizontal integration. In this thesis, we are recapitulating a selection of own contributions in the context of information integration for smart manufacturing systems. With respect to conceptual models we have been employing established industrial standards, in order to facilitate industrial application. We have conceptualized, implemented and tested a series of conceptual models, inter-model mappings and transformations. Our approaches and implementations have been successfully evaluated by a number of experiments and case studies and are therefore a contribution towards model-driven smart manufacturing systems.
Wally, B. (2020). Smart manufacturing systems: model-driven integration of ERP and MOM [Dissertation, Technische Universität Wien]. reposiTUm. https://doi.org/10.34726/hss.2020.26343
A Graphical Toolkit for IEC 62264-2
Laurens LangBernhard WallyChristian HuemerRadek ŠindelářAlexandra MazakManuel WimmerRobert X. GaoKornel EhmannKeywords:
Astract: Among the plethora of industrial standards available in the context of smart manufacturing, one series of standards is consistently being mentioned for dealing with manufacturing operations management: IEC 62264. Its second part provides a conceptual model for the description of production systems and their capabilities, including runtime information such as concrete maintenance schedules or achieved production goals. In this work, we present a concrete graphical syntax and toolkit for the creation and presentation of IEC 62264-2 compliant models, using techniques from model-driven (software) engineering. We have evaluated our tool by conducting a user study for assessing its usability and effectiveness.
Lang, L., Wally, B., Huemer, C., Šindelář, R., Mazak, A., & Wimmer, M. (2020). A Graphical Toolkit for IEC 62264-2. In R. X. Gao & K. Ehmann (Eds.), 53rd CIRP Conference on Manufacturing Systems 2020 (pp. 532–537). Elsevier BV. https://doi.org/10.1016/j.procir.2020.03.049
Model-driven methods for developing ISO-certified safety-critical systems
Laurenz GutlederChristian HuemerKeywords: ISO 26262, EN 50128, DO-178, IEC 61508, MBSE, model-based systems engineering, model-based software engineering, model-driven systems engineering, model-driven software engineering, model-based methods, safety-critical systems, safety life cycle, Systematic Mapping Study, SysML, SysML extension, UML profile, ASIL, ASI, decomposition, ASIL tailoring, safety goal, safety requirement, Automotive Safety Integrity Level, document-centric, international standards for functional safety, design-science research, DSL development, requirement diagram, block diagram, Enterprise Architect, MDG
Astract: Since the release of the IEC 61508 international standard for Functional Safety of Electrical/Electronic/Programmable Electronic (E/E/PE) Safety-related Systems and its specific variants, classical methods of system development have quickly reached their limits due to sophisticated safety requirements such as full traceability. One possible approach to address the issue of managing the ever increasing complexity in the development processes of certified safety-critical systems is model-based systems engineering (MBSE). Different model-based methods are applied depending on their safety-critical domains and specific safety standards such as the ISO 26262 for functional safety of road vehicles rather than applying a set of general methods based only on the parent standard IEC 61508. The first part of the work comprises a Systematic Mapping Study (SMS) investigating and classifying a high number of scientific publications to analyze the similarities and differences of the applied model-based methods and their reasons of application in the standards IEC 61508, ISO 26262 for road vehicles, EN 50128 for railway systems, and DO-178 for airborne systems. Based on the results, a Systematic Map is created in order to identify patterns of model-based methods in different sectors of industry. The second part of the thesis addresses the question of an appropriate means to represent the ISO 26262 Automotive Safety Integrity Level (ASIL) tailoring and decomposition concept in a SysML extension. This includes the development of a SysML profile, a use case, and a descriptive evaluation based on the requirements specified in the ISO 26262 series of standards. This SysML profile can help to simplify the modeling and decomposition requirements for the Automotive Safety Integrity Level concept.
Gutleder, L. (2020). Model-driven methods for developing ISO-certified safety-critical systems [Diploma Thesis, Technische Universität Wien]. reposiTUm. https://doi.org/10.34726/hss.2020.71545
Teaching
Project in Computer Science 1
Semester: 2025S; Nr: 194.145; Type: PR; Hours: 4.0; Language: if required in English; View on TISSProject in Computer Science 2
Semester: 2025S; Nr: 194.146; Type: PR; Hours: 4.0; Language: if required in English; View on TISSOrientation Informatics and Business Informatics
Semester: 2024W; Nr: 180.766; Type: VU; Hours: 1.0; Language: German; View on TISSSeminar for Master Students in Data Science
Semester: 2024W; Nr: 180.772; Type: SE; Hours: 1.0; Language: English; View on TISSSeminar for Master Students in Business Informatics
Semester: 2024W; Nr: 180.779; Type: SE; Hours: 1.0; Language: English; View on TISSResearch Seminar
Semester: 2024W; Nr: 188.446; Type: SE; Hours: 2.0; Language: if required in English; View on TISSLiterature Seminar for PhD Students
Semester: 2024W; Nr: 188.512; Type: SE; Hours: 2.0; Language: German; View on TISSBachelor Thesis for Informatics and Business Informatics
Semester: 2024W; Nr: 188.926; Type: PR; Hours: 5.0; Language: if required in English; View on TISSScientific Research and Writing
Semester: 2024W; Nr: 193.052; Type: SE; Hours: 2.0; Language: German; View on TISSSoftware Engineering
Semester: 2024W; Nr: 194.020; Type: VU; Hours: 4.0; Language: German; View on TISSTechnology for People 2040
Semester: 2024W; Nr: 194.082; Type: VU; Hours: 2.0; Language: German; View on TISSProject in Computer Science 1
Semester: 2024W; Nr: 194.145; Type: PR; Hours: 4.0; Language: if required in English; View on TISSProject in Computer Science 2
Semester: 2024W; Nr: 194.146; Type: PR; Hours: 4.0; Language: if required in English; View on TISSSustainability in Computer Science
Semester: 2024W; Nr: 194.155; Type: VU; Hours: 2.0; Language: English; View on TISSProjects
Bankenabwicklungsmonitor (BAM)
Name: FMA - BAM; Title: Bankenabwicklungsmonitor (BAM); Begins On: 2024-05-13; Ends On: 2025-01-12; Context: Finanzmarktaufsicht (FMA); View Project WebsiteDatenanalyse-Tool für Datenauswertungszwecke - Ausbaustufe II
Name: FMA-AT4DAZ-Stufe2; Title: Datenanalyse-Tool für Datenauswertungszwecke - Ausbaustufe II; Begins On: 2024-01-01; Ends On: 2024-12-31; Context: FMA-Finanzmarktaufsicht; View Project WebsiteDatenanalyse-Tool für Datenauswertungszwecke - Ausbaustufe I
Name: FMA-AT4DAZ; Title: Datenanalyse-Tool für Datenauswertungszwecke - Ausbaustufe I; Begins On: 2023-12-05; Ends On: 2023-12-31; Context: FMA-Finanzmarktaufsicht; View Project WebsiteErforderlichkeit einer Datenbank für Analysezwecke
Name: FMA-DB; Title: Erforderlichkeit einer Datenbank für Analysezwecke; Begins On: 2023-10-16; Ends On: 2024-01-15; Context: FMA-Finanzmarktaufsicht; View Project WebsiteDigitale Kompetenzen @ Parlament
Name: DKP; Title: Digitale Kompetenzen @ Parlament; Begins On: 2021-04-01; Ends On: 2021-09-30; Context: Parlamentsdirektion; View Project WebsiteBIM in tunnelling
Name: BIM im Tunnelbau; Title: BIM in tunnelling; Begins On: 2020-07-01; Ends On: 2023-12-31; Context: Österr. Bautechnik Veranstaltungs G; View Project WebsiteInnovationslehrgang zur Gestaltung der Digitalen Transformation in der Produktentwicklung und Produktion
Name: DigiTrans 4.0; Title: Innovationslehrgang zur Gestaltung der Digitalen Transformation in der Produktentwicklung und Produktion; Begins On: 2016-09-01; Ends On: 2018-11-30; Context: Austrian Research Promotion Agency (FFG); View Project WebsiteSparx Systems Innovations Scheck Plus
Name: Sparx Systems InnovScheckPlus; Title: Sparx Systems Innovations Scheck Plus; Begins On: 2014-04-01; Ends On: 2015-02-16; Context: Austrian Research Promotion Agency (FFG); View Project WebsiteMulti-Tenant ERP System in the Cloud: A Model-Driven Approach Based on the Resource-Event-Agent Ontology
Name: REAlist; Title: Multi-Tenant ERP System in the Cloud: A Model-Driven Approach Based on the Resource-Event-Agent Ontology; Begins On: 2013-09-01; Ends On: 2015-08-31; Context: Austrian Research Promotion Agency (FFG); View Project WebsiteWeb of Needs INfrastructure
Name: WIN; Title: Web of Needs INfrastructure; Begins On: 2012-07-01; Ends On: 2014-10-31; Context: Austrian Research Promotion Agency (FFG); View Project WebsiteE-business Registry Permitting Enterprise Liaisons
Name: ERPEL; Title: E-business Registry Permitting Enterprise Liaisons; Begins On: 2010-05-01; Ends On: 2013-08-31; Context: Austrian Research Promotion Agency (FFG); View Project WebsiteRail track gauging Austrian Federal Railways
Name: SWITCH09; Title: Rail track gauging Austrian Federal Railways; Begins On: 2009-07-01; Ends On: 2009-08-31; Context: Berner & Mattner Systemtechnik GmbH; View Project WebsiteebInterface 3.0 - electronic invoicing
Name: ebInterface 3.0; Title: ebInterface 3.0 - electronic invoicing; Begins On: 2009-01-01; Ends On: 2010-02-28; Context: Austriapro c/o Wirtschaftskammer Österrecih; View Project WebsitePublic Private Interoperability
Name: PPI; Title: Public Private Interoperability; Begins On: 2008-10-01; Ends On: 2011-09-30; Context: Austrian Research Promotion Agency (FFG); View Project WebsiteBusiness Semantics on top of Process Technology
Name: BSopt; Title: Business Semantics on top of Process Technology; Begins On: 2008-04-01; Ends On: 2010-09-30; Context: Austrian Research Promotion Agency (FFG); View Project WebsiteebTransfer - Design and Realization of Know-How Transfer for electronic Billing based on ebInterface
Name: ebTransfer; Title: ebTransfer - Design and Realization of Know-How Transfer for electronic Billing based on ebInterface; Begins On: 2007-01-01; Ends On: 2007-11-30; Context: BM für Wirtschaft und Arbeit; View Project WebsiteTeam
Business Informatics Group, TU Wien
Professors
Christian Huemer
Ao.Univ.Prof. Mag.rer.soc.oec.Dr.rer.soc.oec.
Dominik Bork
Associate Prof. Dipl.-Wirtsch.Inf.Univ.Dr.rer.pol.
Gerti Kappel
O.Univ.Prof.in Dipl.-Ing.inMag.a Dr.in techn.
Henderik Proper
Univ.Prof. PhDResearchers
Aleksandar Gavric
Univ.Ass. MEng. B.Eng.Galina Paskaleva
Projektass.in Dipl.-Ing.inDipl.-Ing.in BSc
Marianne Schnellmann
Univ.Ass.in BSc MScMarion Murzek
Senior Lecturer Mag.a rer.soc.oec.Dr.in rer.soc.oec.
Marion Scholz
Senior Lecturer Dipl.-Ing.inMag.a rer.soc.oec.